API 650 SUG III tanks fabrication

The preparatory work before the construction of the API 650 SUG III tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API 650 SUG III tanks:
Before API 650 SUG III tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

The API 650 petroleum storage tank standard is one of the most widely used design specifications. It is the API 650 standard of the American Petroleum Institute. The main goal of the API 650 standard is to promote the purchase and construction of vertical, above-ground, and welded manufacturing API 650 SUG III tanks tanks through the requirements contained in its parts to ensure that the required safety regulations are met.

The annual sales volume of steel product is over 300,000 tons, and the sales volume has increased year by year. The business scope covers the Southeast Asia, Eastern Europe, Middle East, Africa, North America, and South America. Client services are mainly in the petrochemical, wind power, shipbuilding, steel structure, machinery manufacturing, and construction industries. Throughout the process, we provide customers with professional personal steel customization services and one-stop solutions, professionally set a variety of futures, fast delivery, and excellent prices.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!