The process parameters should be strictly controlled in sand blasting of API 650 storage tanks. The working pressure of abrasive chamber is between 0.5 and 0.6a, and the outlet pressure of air compressor shall not be lower than 0.6 WPa. According to the test results, the distance between nozzle and workpiece shall be controlled at 80 - 200 mm and spraying angle of 30 ~ 75°is appropriate.

API 650 petroleum storage tank stipulates that if the thickness of the lower siding obtained by calculating the anti-overturning moment is greater than the thickness of the API 650 storage tanks hydrostatic pressure test (both do not include the corrosion margin), the calculated thickness of the above siding required by the hydrostatic pressure is It should also be increased by the same proportion, unless special analysis is performed to determine the seismic overturning moment and corresponding stress at the bottom of each layer of API 650 petroleum storage tank wall.

Our company's technical department is the core department of the whole company. There are a group of very professional technical personnel. They provide some architectural drawings according to the ideas of customers, and they are responsible for how to select the right materials. Including the evaluation of steel products such as multi steel plate, API 650 storage tanks and steel pipe, grasp the whole production process, and strictly follow the production standards and customer quality requirements.

Our company has established and constantly improved the customer service system and emergency response system. Through the customer service management system, we track the service of the after-sales service team and provide efficient and standard services in time. At the same time, the company formulates a regular return visit system, compares the historical cases of customer problems, proposes a pre solution, and ensures that the service is in place in a short time.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!