API 650 partially anchored liquid-storage tanks load combinations

For the team, cooperation is the core idea of daily work, and the core of common cooperation is resource sharing. With a perfect resource sharing mechanism, the whole team can be called a unity spirit.A good team lies in the ability to transfer resources, knowledge and information in time among team members in order to achieve the common goals of the team. So that we can share experiences and lessons."

API 650 partially anchored liquid-storage tanks Oil measuring hole: The oil measuring hole is used to measure the height, temperature and sampling of the oil stored in the tank, and is installed near the tank top platform. API 650 partially anchored liquid-storage tanks Fire extinguisher: The fire extinguisher (also known as the flame arrestor) of the oil tank is composed of a fire box, a copper wire mesh and an aluminum partition. It is installed under the breathing valve or safety valve to prevent sparks and air from entering the inside of the tank through the breathing valve or safety valve and causing accidents.

Inspection of Welded Storage Tanks Surfaces Exposed during FabricationThe edges of API 650 partially anchored liquid-storage tanks plates, openings and fittings exposed during fabrication shall be inspected carefully to make sure that any defects have been uncovered, as well as to determine that the work has been performed properly.Minor defects found may be repaired only after the inspector approves the method and extent of repairs. Materials that have more than minor defects that cannot be satisfactorily repaired shall be rejected.Spot radiographic or ultrasonic examination shall be not less than 6 in. extending along the weld. Spot radiography shall comply with the standards given in 7.15.1.3. Where spot radiographic or ultrasonic examination is applied at joint intersections, the surface shall be prepared and examined for a distance of 3 in. on each side of the intersection, making the minimum length of examination 6 in. on the horizontal weld and 3 in. on the vertical weld.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!