API 650 mixed material tanks roundness
In order to further transform the operation mechanism, establish the operation concept of "market-oriented, customer-centric", strive to improve our core competitiveness and promote the rapid development of business; further strengthen customer marketing management, subdivide customer groups, establish a top-down, crisscross, hierarchical marketing mechanism of "everyone is a marketer", and provide for the needs of different levels of customers Corresponding services.
The preparatory work before the construction of the API 650 mixed material tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API 650 mixed material tanks:Before API 650 mixed material tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.
In this project, a cylindrical tank 62 ft 6 in. in diameter is designed for an internal pressure of 4 lbf/in.2 gauge in the vapor space. The plate material is ASTM A131 steel with appropriate grades for different plate thicknesses in accordance with Table 4-1 for a design metal temperature less than 65°F but not less than 25°F. No corrosion allowance is required for any portion of the tank. The top course of the butt-welded cylindrical sidewall is 1/4 in. thick. The roof is a single lap-welded spherical dome with an internal radius of 50 ft and a thickness of 1/4 in. The maximum design liquid level is 6 in. below the plane of the juncture of the tank API 650 mixed material tanks roof and sidewall.