API 650 liquid-storage tanks shell-plate
The seismic effects on the tank wall of API 650 oil storage tank include the inertia moment generated by the weight of the API 650 liquid-storage tanks tank and the hydrodynamic pressure of the reservoir, which can be divided into short period pulse pressure and long period fluid slopping convective pressure.
Prefabrication requirements for API 650 liquid-storage tanks, large vertical storage tanks:1. The machined surface of the edge of the steel plate should be smooth, and there should be no defects such as slag inclusion, delamination, cracks, etc., and the surface hardened layer produced by the flame cutting groove should be removed.2. Dimension deviation after steel plate processing: the deviation of plate width is less than 1.5 mm, the deviation of plate length is less than 2 mm, and the difference between diagonals is less than 3 mm.
Ultrasonic Examination of Butt-welds in PlatesButt-welds in all tank wall courses subjected to a maximum actual operating membrane tensile stress, perpendicular to the welded joint, greater than 0.1 times the specified minimum tensile strength of the API 650 liquid-storage tanks plate material shall be completely examined.Butt-welds in API 620 oil tank wall courses subjected to maximum actual operating membrane tensile stress, perpendicular to the welded joint, less than or equal to 0.1 times the specified minimum tensile strength of plate material shall be spot examined in accordance with Figure Q-2.
The company has five major departments: steel plate production department (including quality inspection team), sales department, market development department, after-sales and logistics department, and finance department. The backbone of steel business from all over the country, with the chairman as the core, integrates self-confidence, independence, passion and responsibility, and strives for excellence! All people share the same belief: "Being a refined steel product line rewards customers, strengthen the steel industry, and realize the corporate dream!
As we all know, steel pipes occupy more space in the process of transportation. If there is no good way of packing, the transportation cost for steel pipes will be a big expense. In view of this characteristic, our company is ingenious and adopts the nest package method to solve this problem perfectly. The premise of the nest package is that the diameters of the steel pipes are different, and the small diameter pipe is inserted in the large diameter pipe. This not only saves the volume, but also saves the transportation cost. It also reduces the loading and unloading workload by half, saves precious time, and enables customers to receive goods earlier.