API 650 larger diameter tanks liner
For employees' development, the company's transformation and development provides employees with a broad career development platform. The company needs "lion-type" entrepreneurial leaders who are full of entrepreneurial enthusiasm and dare to self-renovate. They also need a large number of professional and professional high-quality talents, and employees can get full capacity to display opportunities.
The construction period comparison of mechanical cleaning and manual cleaning for vertical storage tank, API 650 larger diameter tanks. The API 650 larger diameter tanks mechanical cleaning period is short, and the construction period is not affected by the size of the storage tank and the amount of sludge in the tank, and the cleaning equipment operates 24 hours a day. The manual cleaning of the API 650 larger diameter tanks has a long construction period, which is easily affected by the external environment, and the number of workers is limited by the size of the storage tank and the amount of sludge.
API 650 larger diameter tanks Visual InspectionUpon completion of all the foregoing tests, the pressure in the tank shall be released and a thorough visual inspection shall be made of both the inside and outside of the tank, giving particular attention to all internal ties, braces, trusses, and their attachments to the walls of the tank. Anchors shall be checked for snug tightness and adjusted if required. Anchor threads shall be fouled by peening or tack welding to prevent loosening. In lieu of thread fouling, double nuts may be used.Rate of Water Filling and Water TemperatureThe rate at which water is introduced into a tank for a hydrostatic test shall not exceed 3 ft of depth per hour. The foundation, venting equipment, or other conditions may limit the water filling to a lower rate. Pressure shall not be applied above the surface of the water before the tank and its contents are at about the same temperature.