API 650 ground supported liquid storage tanks guide pole erection tolerance requirements

The internal floating plate of internal floating roof tank of API 650 tank is different from that of open floating plate of API 650 ground supported liquid storage tanks External floating roof tank of API 650 tank, so it is impossible to have rain and snow load.

In the petrochemical industry and other industries, large vertical API 650 ground supported liquid storage tanks are often used to store various production raw materials. Usually, the medium with high melting point and easy to crystallize at room temperature can be exported and used after heating, which involves the heating of large vertical storage tanks. The heating system is an auxiliary facility for heating of large vertical storage tank. It is often necessary to design external heating coil or internal heating coil system.

Temporary Openings after Hydrostatic Test
When approved by the Purchaser in writing, and only in the case of tanks which when complete have no shell penetrations, it is permitted to restore by welding up to four temporary shell openings after the hydrostatic test in accordance with the provisions of this section. Each temporary opening shall be restored by the insertion of a shell plate that matches the thickness and specification of adjacent shell material, and is welded into place with full fusion butt-welds. The API 650 ground supported liquid storage tanks insert plate shall be round with diameter no less than 24 in. and no greater than 42 in.

When talking about our team, it is hard not to mention our QC department (Quality Control). We have built strict qualitycontrol system to guarantee the steel quality. During the steel materials production, we have strict monitoring measures and indicators, and ensure no chemical composition, mechnical properties and so on technical problems for the steel materials API 650 ground supported liquid storage tanks. After production, our QC department will conduct another inspection regarding to the steel quantity, dimension, mark and so on points before delivery.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!