API 650 flexible liquid storage tanks designed for seismic forces
Allowable Design StressesThe maximum allowable design stresses for the API 650 flexible liquid storage tanks materials outlined in Q.2.1 shall be in accordance with Table Q-3.The values for the allowable design tensile stress given in Table Q-3 for materials other than bolting steel are the lesser of (a) 331/3% of the specified minimum ultimate tensile strength for the material or (b) 662/3% of the specified minimum yield strength, but they are 75% of the specified minimum yield strength for the stainless steel, nickel alloy, and aluminum materials. Allowable test stresses are based on the limitation of API 620 oil tank storage standard Q.8.1.3.Upon completion of API 650 flexible liquid storage tanks construction, provide Purchase with a Vendor's Certification that the tank conforms to the requirements of API 650 and to the additional requirements as specified."In year 2014, we participate Bangladesh national railway tender for steel plate making train carriage. We finally got the order 1000 tons and it took us 40 days to produce all the plates. The client gave very high comments to our service and API 650 flexible liquid storage tanks product quality.In year 2015, we won another tender for 1200 tons B480GNQR steel coils in Bangladesh, which you can find in the steel coil part."Atmospheric API 650 flexible liquid storage tanks refer to storage tanks whose gas or vapor pressure is greater than -0.02MPa but less than 0.1MPa. Metal atmospheric storage tanks made of steel welded on the ground are often used to store petroleum, chemical and other similar liquids. Atmospheric API 650 flexible liquid storage tanks usually have a connecting pipe directly connected to the atmosphere, so that the operating pressure in the storage tank does not exceed the design pressure at all times.When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Latest NewsMore+