API 650 duplex stainless steel tanks convective spectral acceleration parameter

Lateral braces between outer bay rafters must be provided if asymmetrical structural shapes are used for rafters and if the API 650 duplex stainless steel tanks API 650 tanks are located in areas subject to earthquakes. The bracing must be adequately sized for the seismic zone specified.

In this project a cylindrical tank 75 ft in diameter is designed for an internal pressure of 0.5 lbf/in.2 gauge in the vapor space. The plate material is ASTM A131 Grade B steel for thicknesses of 1/2 in. and less.
The top course of the butt-welded cylindrical sidewall is 1/4 in. thick. The tank API 650 duplex stainless steel tanks roof is a conical shape with a 2:12 slope and a 1/4 in. thickness with single full-fillet welded lap joints. The maximum design liquid level is 6 in. below the plane of juncture of the roof and sidewall.

API 650 duplex stainless steel tanks weld tightness test: remove dirt from the API 650 duplex stainless steel tanks weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.

Firmly establish the "people-oriented, safe development" concept, strictly follow the safety production policy of "safety first, prevention first, comprehensive management", strengthen and improve the management and supervision of safety production in an all-round way, and strive to improve the controllability of safety management And effectiveness, cultivate safety culture, improve long-term safety production mechanism, and build a harmonious BEBON.

The company's logistics and transportation department is responsible for developing high-quality third-party logistics companies, to coordinate and follow up the situation of steel materials transportation. Third-party logistics companies provide us with professional logistics services. With this logistics management method, the time for delivery of steel materials is faster, and the logistics service is professional, multifunctional and comprehensive.

The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!