API 650 anchored tanks internal components

Pipeline transportation of API 650 oil tank is not less than the maximum consumption of 3 to 5 days. The daily operating time of API 650 anchored tanks office buildings and fuel oil equipment is 12-16 hours; for high-end residential hotel buildings, the daily operating time is 16-24 hours.

Welders participating in the construction of API 650 anchored tanks must pass the examination and perform welding within the validity period of the qualified items. Special operators such as on-site maintenance electricians, cranes, and shelf workers must hold job certificates. All oil pipelines need to use arc welding for bottoming and electric welding to ensure the welding quality. Oil tanks and process pipelines must be tested for non-destructive flaws in accordance with the flaw detection ratios and methods required by the design and acceptance specifications. The flaw detectors must be certified.

Design of Compression-ring Regions
In this project, a cylindrical tank 30 ft in diameter is designed for an internal pressure of 5 lbf/in.2 gauge in the vapor space. The plate material is ASTM A131 Grade A steel for thicknesses of 1/2 in. and less. The top course of the butt- welded cylindrical sidewall is 1/4 in. thick, including a 1/16 in. corrosion allowance. The tank API 650 anchored tanks roof is a butt-welded spherical dome with an internal radius of 30 ft and a thickness of 1/4 in., including a 1/16 in. corrosion allowance. The maximum design liquid level is 6 in. below the plane of the juncture of the roof and sidewall.

Our company has sales department, technology department, quality inspection department, after-sales department, logistics department. Each department has professional knowledge and high professional quality, put customers first, think about the interests of customers, actively communicate with customers and solve problems smoothly.

Land transportation inquiry: (RMB fee) it is required to master the kilometers and towing price of major cities; packing price of each port area; customs clearance fee, commodity inspection fee, and animal and plant inspection fee standard. Key information to be clarified after accepting the consignation of the consignor (generally fax): shipping date, number of packages, box type, box quantity, gross weight and volume.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!