API 650 anchored liquid-storage tanks maximum design temperature
Impact Requirements for Controlled-rolled or Thermo-mechanical Control Process (TMCP) Plates: Subject to the approval of the Purchaser, controlled-rolled or TMCP plates (material produced by a mechanical- thermal rolling process designed to enhance the notch toughness) may be used where normalized plates are required. API 620 welded storage tanks each used plate, as rolled, shall be Charpy V-notch tested to the requirements of R.2.1.2.
API 650 petroleum storage tank body design is mainly the design of tank bottom, API 650 anchored liquid-storage tanks tank top and tank wall, and the design of tank wall is particularly important. As the main pressure bearing part of API 650 petroleum storage tank, the tank wall bears loads including liquid pressure, wind pressure, seismic load, opening stress, etc. The calculation of such loads is explained in detail in various API 650 anchored liquid-storage tanks storage tank design standards. But in addition, the API 650 petroleum storage tank wall also bears the push-pull force and torque of the connected pipeline.
Our client purchase more than 900 tons pipe API 650 anchored liquid-storage tanks from India. And we do the inspection for each one pipe before shipment.During the inspection, the inspector saw that the surface of the square pipe kept the original color of the stainless steel, no fracture, no depression and other quality defects was found.
}API 650 anchored liquid-storage tanks weld tightness test: remove dirt from the API 650 anchored liquid-storage tanks weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.