aluminum sheet 5050 API Std 650 aboveground steel oil storage tanks
The calculated thickness of the above-mentioned wall panels required by the hydrostatic pressure is also It API Std 650 aboveground steel oil storage tanks should be increased by the same ratio, unless special analysis is performed to determine the seismic overturning moment and the corresponding stress at the bottom of the wall of each layer of API 650 tank.
Requirements for prefabrication of the top of large vertical API Std 650 aboveground steel oil storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
Large Low-Pressure Tanks Corrosion AllowanceIn cases in which the rate of corrosion is closely predictable, additional metal thickness over and above that required for the initial operating conditions shall be provided and shall be at least equal to the expected corrosion loss during the desired life of the tank.When corrosion effects are indeterminate before the tank is designed (although they are known to be inherent to some degree in the service for which the tank is to be used), and when corrosion is incidental, localized, or variable in rate and extent, the best judgement of the API Std 650 aboveground steel oil storage tanks designer must be exercised in establishing reasonable maximum excess tank wall thicknesses. For all tanks that come under this classification, a minimum corrosion allowance of 1/16 in. shall be provided.
We can process the steel materials according to your drawing. Or if you can not make drawing, please send us API Std 650 aboveground steel oil storage tanks specific data and requirements, our technical department can make design and drawing for you, and then confirm with your technician or engineer. If all is OK, our processing center will process the steel materials according to the drawing. So no matter what size and shapes you need, we can meet demands at the most time.
The company's logistics adopts the method of cooperation with logistics companies. As a third-party logistics company is engaged in the operation of multiple logistics projects, it can integrate various logistics resources, making the logistics operation cost relatively low and the logistics operations more efficient. Thus we can provide more professional logistics services, while also focusing on our core business of steel materials.