aluminum sheet 3003 API standard 650 welded steel oil storage tanks

The advantages of API 650 floating roof tanks have obvious environmental and economic benefits: in a specific climate environment, according to historical data, the economic value of the API standard 650 welded steel oil storage tanks floating roof tanks in API 650 due to the reduction of oil and gas volatilization within 3-6 months is equivalent The installation and purchase cost of the API standard 650 welded steel oil storage tanks inner floating roof means that the cost of the inner floating roof can be recovered within half a year.

API standard 650 welded steel oil storage tanks foam generator is a fire extinguishing device fixed on the oil tank. One end of the foam generator is connected to the foam pipeline, and one end is flanged on the top layer of the API standard 650 welded steel oil storage tanks wall. Fire extinguishing foam flows through the air intake entrance of the fire foam chamber, inhaling a large amount of air to form foam, and breaking through the insulating glass into the tank (glass thickness is not greater than 2mm), so as to achieve the purpose of fire fighting.

Inspection of low-pressure storage tank Butt-weldsComplete penetration and complete fusion is required (to the degree mandated by the acceptance criteria for examination method utilized) for welds joining tank wall plates to API standard 650 welded steel oil storage tanks tank wall plates. Examination for quality of welds shall be made using either the radiographic method specified in API 620 standard 7.15.1 and applied in 7.17, or alternatively, by agreement between the Purchaser and the Manufacturer, using the ultrasonic method specified in 7.15.3.1. In addition to the radiographic or ultrasonic examination, these welds shall also be visually examined as specified in 7.15.5. Furthermore, the Purchaser’s inspector may visually inspect all butt-welds for cracks, arc strikes, excessive undercuts, surface porosity, incomplete fusion, and other defects.

BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.

The company's logistics adopts the method of cooperation with logistics companies. As a third-party logistics company is engaged in the operation of multiple logistics projects, it can integrate various logistics resources, making the logistics operation cost relatively low and the logistics operations more efficient. Thus we can provide more professional logistics services, while also focusing on our core business of steel materials.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!