Alclad 3003 aluminum plate API Std 650 cylindrical tanks
API 650 stipulates that an open tank should be provided with a wind-resistant ring to ensure that the API Std 650 cylindrical tanks tank body maintains its roundness when subjected to wind. There are no hard and fast rules for vault API 650 storage tanks. It can be determined by comparing the equivalent wall height with the maximum height of the unreinforced tank wall.
API Std 650 cylindrical tanks, Oil tanks can be divided into above ground storage tanks, underground storage tanks, offshore tanks and submarine tanks according to their installation positions. Oil tanks can be divided into crude oil tanks, fuel oil tanks, lubricating oil tanks, edible oil tanks, etc.. According to the use of oil tanks, oil tanks can be divided into production tanks, storage tanks, etc.. According to the external style, oil tanks can be divided into vertical tanks, horizontal tanks, etc.. According to the composition structure, oil tanks can be divided into fixed roof storage tank, floating roof tank, spherical tank, etc.
The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).