Aboveground API 650 open top welded storage tanks

API 620 Crude Oil Tank Non-pressure Parts
Welds for pads, lifting lugs, and other nonpressure parts, as well as temporary lugs for alignment and scaffolding attached to primary components, shall be made in full compliance with a welding procedure qualified in accordance with Q.6.1. Lugs attached for erection purposes shall be removed, and any significant projections of API 650 open top welded storage tanks weld metal shall be ground to a smooth contour. Plate that is gouged or torn in removing the lugs shall be repaired using a qualified procedure and then ground to a smooth contour. Where such repairs are made in primary components, the area shall be inspected by the liquid-penetrant method. A visual inspection is adequate for repairs in secondary components.

The Standard has gained international recognition and is the standard of choice of most builders of large liquid above ground API 650 open top welded storage tanks storage tanks. One reason for this is that the API 650 Standard was created and is revised by API committees comprised of the world s best tank structural engineers who also rely on the experience of tank owners and tank construction companies.

Oil tank is often used to store crude oil, diesel oil, gasoline and other oil. The main structure of API 650 open top welded storage tanks is composed of tank top, tank wall, tank bottom and accessories. The API 650 open top welded storage tanks should be inspected after the completion of construction, and the detection methods of different structure positions are different. Tank wall inspection: for the newly built oil tank, water filling test shall be conducted to check whether the tank wall is tight, and the appearance inspection shall be conducted for the tank wall plate and weld. Tank wall thickness detection: the oil tank wall thickness is mainly detected by ultrasonic wave, with high efficiency.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!