A633 Gr C plates API standard 650 aluminum tanks
Oil tank is often used to store crude oil, diesel oil, gasoline and other oil. The main structure of API standard 650 aluminum tanks is composed of tank top, tank wall, tank bottom and accessories. The API standard 650 aluminum tanks should be inspected after the completion of construction, and the detection methods of different structure positions are different. Tank wall inspection: for the newly built oil tank, water filling test shall be conducted to check whether the tank wall is tight, and the appearance inspection shall be conducted for the tank wall plate and weld. Tank wall thickness detection: the oil tank wall thickness is mainly detected by ultrasonic wave, with high efficiency.
The liquid level of API 650 oil storage tank is covered by floating roof. The storage liquid of API 650 oil storage API standard 650 aluminum tanks tank is isolated from the air, reducing air pollution, fire and explosion hazards, and easy to ensure the quality of liquid storage. It is especially suitable for the API standard 650 aluminum tanks storage of high-grade gasoline, jet fuel and toxic and easily polluted liquid chemicals.
In 2019, through the concerted cooperation of the enterprise team, the sales volume has grown steadily, and the annual sales volume has exceeded 300 million yuan. For this reason, both the investors and employees of the enterprise have received satisfactory returns. With strong development potential and brand advantages, we have always been committed to "integrity, efficiency, pragmatism, dedication" corporate spirit, dedication to society, and return to the public. From this perspective, the enterprise will have a bright future. In a good environment with strong hardware facilities and excellent management personnel, we can make sure that the company will develop stronger and bigger.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).