A333 grade 1 pipe API standard 650 aboveground welded storage tanks

API 650 sets minimum requirements for the design, material, construction, and testing for aboveground, open and closed-top, cylindrical API standard 650 aboveground welded storage tanks steel storage tanks in different capacities and sizes, roughly equating to the pressure of the atmosphere (not greater than the weight of the roof plates).

Prefabricating API standard 650 aboveground welded storage tanks components before construction can improve construction efficiency, save time and cost, and is currently a common method for the construction of large vertical storage tanks. The main prefabricated components of a large vertical API standard 650 aboveground welded storage tanks include the tank body, the storage tank wall, the top of the storage tank, the bottom of the storage tank, and the accessories of the storage tank. The prefabrication of the components should follow a reasonable workflow, and carry out appropriate heat treatment and testing, so as to improve manufacturing accuracy.

Surface Inspection of low-pressure storage tank Component PartsBefore assembly, unless already so certified by shop inspectors, all sidewall plates or sections and roof and bottom plates shall be inspected for thickness, freedom from injurious defects, and soundness of any welded joints.Check of Dimensions of API standard 650 aboveground welded storage tanks Component PartsAll formed plates and curved sections shall be checked for conformance with the planned dimensions and cross section. For unusual repairs the inspector should keep a record of measurements taken at sufficient intervals to constitute a satisfactory record.Check of Chemical and Physical Property DataThe inspector shall check the material being assembled by the lists of the plates from the mill, their heat numbers, chemical analyses, and mechanical properties as given on mill reports and shall see that copies are available to be attached to the Manufacturer’s report.

Customer service center has provided after-sales service for many large-scale information systems, and has accumulated rich working experience in the process of API standard 650 aboveground welded storage tanks service for many years. It can provide accurate, timely and high-quality support and service for users, which is well received by users.

Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!