A234 grade WPB pipe API standard 650 ground supported tanks

Define the welding sequence of API standard 650 ground supported tanks bottom plate: the welding sequence of metal vertical storage tank shall be carried out according to the procedure required by the welding scheme. Spot welding shall be consistent with the formal welding requirements, and no spot welding shall be carried out for the weld not welded. Back bar should be added to prevent deformation when welding the full length seam of middle plate, butt joint of edge plate and turtle shell joint.

Uplift on Foundation
For API Standard 620 tanks with an internal design pressure less than 1 lbf/in.2 gauge, the uplift shall be taken as the smaller of the maximum uplift values computed under the following conditions:
a)The internal design pressure times 1.5 plus the design wind load on the shell and roof.
b)The internal design pressure plus 0.25 lbf/in.2 gauge plus the design wind load on the shell and roof.

For areas with high groundwater levels, the operator should take anchoring and anti-floating measures for buried horizontal API standard 650 ground supported tanks oil tanks; API 650 oil tanks can be used for heavy fuel oil, heaters are separately designed, and buried tank material outlets are installed with bottom valves and connections. consider.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!