A106 grade B pipe API standard 650 horizontal tank
API 650 storage tank stipulates that if the thickness of the lower wall panel obtained by calculating the anti-overturning moment is greater than the thickness of the API standard 650 horizontal tank hydrostatic pressure test (both do not include the corrosion allowance).
Proper use of API standard 650 horizontal tank and precautions:1. The API standard 650 horizontal tank must be used within the safe height range;2. Check before use to ensure that the safety valve and breathing valve are flexible and easy to use;3. The explosion-proof and fire-proof safety measures for oil tanks are implemented effectively;4. The oil level in the API standard 650 horizontal tank should be accurately measured when receiving and delivering oil, so as to prevent overflow or empty;5. In the process of receiving and sending oil, the flow rate of oil should be controlled, and it should not be too fast to avoid electrostatic accidents.
The API standard 650 horizontal tank outer tank, which is not in contact with the vaporized liquefied gas, may be of single-welded lap or single-welded butt construction when the thickness does not exceed 3/8 in.; at any thickness, the API 620 oil tank outer tank may be of double- welded butt construction without necessarily having full fusion and penetration. Single-welded joints shall be welded from the outside to prevent corrosion and the entrance of moisture.
The salesman of the company is familiar with all aspects of knowledge. Understand the company profile: group, company profile, various honor certification, enterprise's functional strength and other advantages analysis. Know the main product brand types and specifications of the company, and know the special knowledge of the product (production process and advantages of the product, simple identification method of product quality, etc.)
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).