6m diameter API Std 650 welded storage tanks

API 650 petroleum storage tanks are used for API Std 650 welded storage tanks storage. API 650 petroleum storage tanks can be made of carbon steel, austenitic stainless steel and nickel alloy (only for low temperature). Welding API Std 650 welded storage tanks certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For API 650 petroleum storage tanks, non-destructive inspections are required, but third-party inspections are not required.

For the welding of API Std 650 welded storage tanks bottom, attention should be paid to the slag removal and drying of the welding joint before welding, and there is no sediment and oil contamination in the lap joint of steel plate. The manufacturing quality and production efficiency of the central plate can be obviously improved by adopting the rolling central plate. The butt joint is used between the rolling plates to improve the installation conditions of the central plate at the bottom of the API Std 650 welded storage tanks. The welding sequence of the central plate is from the center of the central plate to the surrounding.

"Adhere to green development, implement basic national policies to conserve resources and protect the environment, and take the goal of creating a resource-saving and environment-friendly iron and steel joint enterprise to promote the construction of ecological civilization.Strengthen the construction of core talents, further release the talents' innovative wisdom and innovation potential, and promote the efficient and high-quality development of enterprises. Adhere to the people-oriented principle, persist in relying on employees for development, share development results with employees, and build a harmonious enterprise."

Any joints between the adjacent sections of API 620 oil storage tank stiffening rings, as shown in Figure Q-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joint ends. All weld passes shall be started at the rat hole and other weld joint ends and shall be completed by moving away from these ends. Passes shall be overlapped away from edges to provide a smooth continuous weld.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!