66m diameter API standard 650 self-anchored flat-bottom steel tanks
Unqualified welding quality of API standard 650 self-anchored flat-bottom steel tanks is prone to hidden dangers such as oil tank steel plate cracks and leakage. To avoid this situation as much as possible, it needs to be avoided when the oil storage tank is manufactured. Scientific and reasonable measures are adopted to control the welding quality when welding the API standard 650 self-anchored flat-bottom steel tanks. How to reasonably control the welding process quality of oil storage tanks?
Design of Reinforcement for Single Openings in Tank WallsThe 20 in. x 29 in. obround manhole shown in Figure F-5 is located in solid plate in the sidewall of a cylindrical storage tank 45 ft in diameter in an area where the thickness of the wall plate, tw, is 1/2 in. No corrosion allowance is required. The total internal pressure, Pl + Pg, at the horizontal centerline of the opening is 27.5 lbf/in.2 gauge. The thickness of the wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.485 in. The manhole neck is fabricated by welding from 3/8 in. plate. The materials in the API 620 tank wall, the manhole neck, and the reinforcing pad conform to ASTM A516 Grade 60. The joints in the welded steel storage oil tank wall and the longitudinal joint or joints in the manhole neck are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.
Group consciousness is an important psychological factor for the formation of enterprise internal cohesion. The formation of API standard 650 self-anchored flat-bottom steel tanks enterprise group consciousness makes every employee of the enterprise regard their work and behavior as an integral part of the realization of enterprise goals, make them feel proud of themselves as a member of the enterprise, have a sense of honor for the achievements of the enterprise, and thus regard the API standard 650 self-anchored flat-bottom steel tanks enterprise as the community and belonging of their own interests.
Before pressure testing, thoroughly flush the API 650 tank floating roof primary drain hose system. Supply API standard 650 self-anchored flat-bottom steel tanks blind flanges, gaskets, and bolting (for other types of blanking covers as may be required) necessary for testing.