6063 aluminum pipe API 650 welded steel oil storage tanks

API 650 welded steel oil storage tanks any joints between the adjacent sections of stiffening rings, as shown in Figure R-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joints ends. All weld passes shall be started at the rat hole.

The tank wall design of API 650 oil storage tank. Since there is no ventilation pipe directly connected with the outside on the top of the API 650 welded steel oil storage tanks tank, the ventilation between the inside and outside of API 650 oil storage tank is realized by the respiration valve. The constant pressure of the respiration valve is 0.3kPa, so the pressure on the top of the tank is 0.3kPa.

1200 tons API 5LGRB strips to Bangladesh. In December of 2015, we get one tender project from National Tubes Limited, which is a famous national enterprise in Bangladesh. It is an order of 1200 tons API 5L Gr. B steel strips, they bought these cargo to fabricate ERW pipe in local place.

}

With the continuous development of large-scale oil storage tanks, the foundation of API 650 welded steel oil storage tanks has also continued to grow. Among them, API 650 welded steel oil storage tanks vertical oil tanks are storage tanks commonly used to store crude oil, diesel, gasoline and other oil materials. This type of storage tank is set up as a cylindrical shape. The bottom of the tank is a circular flat bottom plate, and the load surface of the oil tank is basically horizontal, which can generally be regarded as a uniform load, and has greater flexibility.

When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!