5456 aluminum rod API 650 special tank
Except as permitted by API standard 620 Q.8.6, the test shall be conducted after the entire tank is complete, before the insulation is applied. Except as limited by foundation or stress conditions, the test shall consist of filling the tank with water to the design liquid level and applying an overload air pressure of 1.25 times the pressure for which the vapor space is designed. The load on the supporting foundation shall preferably not exceed the established allowable bearing value for the tank site. Where a thorough evaluation of the foundation justifies a temporary increase, the established allowable bearing may be increased for the test condition, but the increase shall be not more than 25%.
According to API standard 650, the stairs used for API 650 petroleum storage tanks or thermal insulation tanks should be double longitudinal beams supported by a minimum of ribs. If the gap between the API 650 special tank tank shell and the stringer of the API 650 petroleum storage tank exceeds 200mm, handrails should be provided on both sides of the stairs. Unless otherwise specified, according to API 650 special tank ASTM A123, the following accessories shall be hot-dip galvanized. The damaged zinc coating should be repaired with zinc alloy.
The Egypt customer ordered 130 tons API 650 special tank stainless steel plate in stock, and this batch has left port today for its destination today(October 25th, 2019). 316l stainless steel is molybdenum-bearing austenitic stainless steel. This material has better corrosion resistant property than 304/314L for it's higher Ni and Mo content. (it is considered to be marine grade stainless steel, not suitable for warm sea water treatment). 316L austenitic stainless steel supplied by our company has good formability and weldablity, additionally it is proved to have excellent properties of tensile, creep and stress-rupture strengths in elevated temperature environment.
}API 650 special tank construction must adhere to the design drawings, acceptance specifications and construction plans. If the design needs to be modified during API 650 special tank construction, it must be approved by the original design unit or Party A’s representative and relevant personnel of the supervision unit, and written visa procedures must be completed in advance. The equipment and main materials used in the oil tank construction project must have certificates of conformity and quality assurance.
We are willing to cooperate sincerely with you with high-quality API 650 special tank products and sincere service to expand the market and create brilliant! We will work hard to create a first-class steel company and provide you with faster and more considerate after-sales services! Moreover, our shipbuilding steel plates have been certified by the nine countries' classification societies including DNV, ABC, GL, LR, BV, CCS, RINA, NK, and KR. The quality assurance system has passed ISO9001-2000 standard certification.