5456 aluminum pipe API Std 650 welded steel oil storage tanks
Shell Stiffening Rings for Tanks That Contain LiquidInternal or external shell stiffening rings may be required to maintain roundness when the tank is subjected to wind, vacuum, or other specified loads. When API Std 650 welded steel oil storage tanks stiffening rings are required, the stiffener-to-shell weld details shall be in accordance with Figure Q-1 and Q.3.5.2 through Q.3.5.5.Three-plate laps or butt-weld junctions in tank bottoms shall be not closer than 12 in. from each other or from the butt-welds of the annular plates.Bottom plates, other than annular bottom plates for a 9% or 5% nickel steel or stainless steel tank that contains liquid, may have a minimum thickness of 3/16 in. exclusive of any specified corrosion allowance.
Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API Std 650 welded steel oil storage tanks test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API Std 650 welded steel oil storage tanks test.
In October, 2018, our Malaysia customer purchased 600 Tons CCS-AH36 Ship Building Steel Plates to use in their shipbuilding project .This customer is a famous shipyard in Malaysia. Their company has the business scope of tourism, API Std 650 welded steel oil storage tanks shipbuilding, transportation and so on. As a terminal manufacturer, they have strict requirements on quality . After visiting our factory, the customer are very satisfied with the quality of this batch of API Std 650 welded steel oil storage tanks CCS-AH36 Ship Building Steel Plates.
}Requirements for prefabrication of the top of large vertical API Std 650 welded steel oil storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
The after-sales service department will pay return visit to each customer by call or email, report problems found during the return visit in time, and discuss with the production and quality inspection center to propose effective solutions and follow up in a timely manner, so as to ensure the benefits each customer are fully guaranteed, and to provide customers with more value-added services.