5456 aluminum bar API 650 vertical welded storage tanks
The construction period comparison of mechanical cleaning and manual cleaning for vertical storage tank, API 650 vertical welded storage tanks. The API 650 vertical welded storage tanks mechanical cleaning period is short, and the construction period is not affected by the size of the storage tank and the amount of sludge in the tank, and the cleaning equipment operates 24 hours a day. The manual cleaning of the API 650 vertical welded storage tanks has a long construction period, which is easily affected by the external environment, and the number of workers is limited by the size of the storage tank and the amount of sludge.
The API 620 large storage tank nozzle neck is fabricated by welding from 1/2-in. plate. The materials in the tank wall, the nozzle neck, and the reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank wall are fully radiographed, double-welded butt joints. The longitudinal joint in the nozzle neck is of the same type API 650 vertical welded storage tanks but is not radiographed; however, the longitudinal joint and all other parts of the nozzle-and-wall-plate assembly have been shop stress relieved after fabrication, as required by 5.25. The adequacy of the reinforcement and attachment welds shown in Figure F-6 shall be determined.
API 650 is widely used for tanks that are designed to internal pressures of 2.5 PSI or less and store products such as crude oil, gasoline, chemicals and API 650 vertical welded storage tanks produced water. Advance Tank has extensive experience with API 650 tanks ranging in diameter from 8' - 300' for refineries, terminals, pipeline facilities and other clients.