5454 aluminum tube API 650 SUG II tanks

The ring of API 650 SUG II tanks annular plates shall have a circular outside circumference, but may have a regular polygonal shape inside the tank shell with the number of sides equal to the number of annular plates. These pieces shall be butt-welded in accordance with API Standard 620 R.7.1.1, Item b. The plates of the first shell course shall be attached to the annular bottom plates by welds as required by API Standard 620 5.9.5 except when a full penetration weld is used or required.

Design calculations and drawings required API 650 SUG II tanks for the fabrication and erection of each API 650 tank. A drawing index for each API 650 tank is required and shall be re-submitted each time drawings are revised and re-issued.

With the fast development in Myanmar, Myanmar navy build frigate every year. Bebon Cooperate with Myanmar Navy from from 2015. They purchased 412 ton API 650 SUG II tanks LR AH36 steel plate from Bebon as trial order in 2015. After receiving the goods, they speak highly of the quality and bebon's service. After that they purchase the shipbuilding steel plate from bebon regularly. In May,2018, the Myanmar navy's local representative visit our office and production line, and sign another contract 2025 tons API 650 SUG II tanks LR A shipbuilding steel plates order in our office.

}

Oil tank is often used to store crude oil, diesel oil, gasoline and other oil. The main structure of API 650 SUG II tanks is composed of tank top, tank wall, tank bottom and accessories. The API 650 SUG II tanks should be inspected after the completion of construction, and the detection methods of different structure positions are different. Tank wall inspection: for the newly built oil tank, water filling test shall be conducted to check whether the tank wall is tight, and the appearance inspection shall be conducted for the tank wall plate and weld. Tank wall thickness detection: the oil tank wall thickness is mainly detected by ultrasonic wave, with high efficiency.

Our company will accept the product quality objection registration record, pass it to the API 650 SUG II tanks production unit and relevant departments, and timely coordinate the supervision of product API 650 SUG II tanks quality objection. Our company coordinates the relevant department personnel to the customer unit to carry on the investigation, the processing.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!