5454 aluminum plate API Std 650 ground supported tanks

Due to irregular operation of API Std 650 ground supported tanks welding, there are many weld deformations during the construction process. Before specific operations, most construction units have formulated relatively complete construction plans and set up special welding process instructions, but the operators have not fully performed welding in accordance with various process guidance requirements and construction specifications, resulting in some quality problems of oil storage tanks. How can we reduce or even avoid this kind of situation?

The API 620 large storage tank nozzle neck is fabricated by welding from 1/2-in. plate. The materials in the tank wall, the nozzle neck, and the reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank wall are fully radiographed, double-welded butt joints. The longitudinal joint in the nozzle neck is of the same type API Std 650 ground supported tanks but is not radiographed; however, the longitudinal joint and all other parts of the nozzle-and-wall-plate assembly have been shop stress relieved after fabrication, as required by 5.25. The adequacy of the reinforcement and attachment welds shown in Figure F-6 shall be determined.

Determination of API 650 oil tank container: The total volume should be determined according to factors such as transportation mode and API Std 650 ground supported tanks fuel supply cycle. For train and ship transportation, the maximum consumption is not less than 20-30 days; the maximum consumption for automobile transportation is not less than 5-10 days.

In particular, the EU imports a large amount of iron ore from central and South America and Oceania, which are mainly transported by sea. The perfect port infrastructure makes the port operation cost of EU iron ore raw materials import relatively low. However, the API Std 650 ground supported tanks steel transportation between EU Member States is mainly railway transportation, and the EU member states have established a very developed railway network and railway information infrastructure.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!