5154 aluminum bar API 650 petroleum storage tanks
All edges of the inner wall of the API 650 petroleum storage tank to be lined or coated must be rounded and flat to a minimum radius of 3mm. The API 650 petroleum storage tanks internal welding seam must be completely sealed welding, with a smooth surface and no air holes, air pockets and local protrusions. Remove welding spatter. As specified in API 650 petroleum storage tank design drawings, the seller must perform additional surface treatment.
Crack treatment of API 650 petroleum storage tanks weld area: find out the crack tip with ray or ultrasonic flaw detection, drill cut-off holes at both ends of the crack with the cut-off method, the hole depth is slightly greater than the crack depth, or groove (crack stop groove) is made by angle grinder at both ends of the crack, shovel and grind the whole crack, and grind it into a suitable groove; use radiographic inspection and dye detection to verify that the crack has been completely excavated, and finally repair welding.
Protection of Plates during Shipping and StoragePlates shall be adequately protected during shipping and storage to avoid damage to API 650 petroleum storage tanks material plate surfaces and edges from handling (scratches, gouge marks, etc.) and from environmental conditions (corrosion, pitting, etc.).Plates shall be protected from moisture or stored in inclined position to prevent water from collecting and standing on surface.
Our company will set up a full-time service engineer for the project, who is responsible for the interface and coordination of technical support and after-sales service of the API 650 petroleum storage tanks project. In response process of customer service center, in case of technical support and after-sales service demand, the user shall contact the full-time engineer of API 650 petroleum storage tanks customer service center, and the technical personnel will give corresponding answers and on-site treatment according to the needs of users.
Land transportation inquiry: (RMB fee) it is required to master the kilometers and towing price of major cities; packing price of each port area; customs clearance fee, commodity inspection fee, and animal and plant inspection fee standard. Key information to be clarified after accepting the consignation of the consignor (generally fax): shipping date, number of packages, box type, box quantity, gross weight and volume.