3m diameter API standard 650 anchored liquid-storage tanks
The API Std 650 standard published by the American Petroleum Institute (API) is designed to provide the petroleum industry with welded steel tanks for use in the API standard 650 anchored liquid-storage tanks storage of petroleum products and other liquid products commonly handled and stored by the various branches of the petroleum industry.
The factors affecting the "small breathing" loss of API standard 650 anchored liquid-storage tanks are: 1. It is related to the change of temperature difference between day and night. The greater the change of temperature difference between day and night, the greater the loss of "small breathing"; on the contrary, the smaller the change of temperature difference between day and night, the smaller the loss. 2. It is related to the sunshine time of the oil storage tank. The longer the sunshine, the more the "small breathing" loss; otherwise, the less the loss.
Keep in mind your mission and never forget your mission." At present, the BEBON steel leadership team unites the majority of cadres and employees to keep in mind their glorious missions, guided by Xi Jinping's ideology of socialism with Chinese characteristics in the new era, fully implementing the spirit of the 19th CPC National Congress, in-depth implementation of the requirements of the "three advances", pioneering spirit, and striving In order to lead high-quality development with innovation, build a new pattern of Anshan Iron and Steel's revitalization and development, strive to build the most internationally influential steel company, and make new contributions to the start of a new journey for BEBON Iron and Steel Group.
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.