120ft diameter API 650 aboveground welded storage tanks

Design calculations and drawings required API 650 aboveground welded storage tanks for the fabrication and erection of each API 650 tank. A drawing index for each API 650 tank is required and shall be re-submitted each time drawings are revised and re-issued.

The work concept attaches importance to talents, creates a high-income and high-standard employment mode and work mode, actively advocates all kinds of talents to inspire each other, respect each other, unite and act together, cultivates employees' corporate interests above all else, is tolerant and enterprising, learns correct ways of doing things, improves employees' Professional quality, encourages and urges employees to make continuous progress, Continuously realize self value and grow together with the enterprise.

Except as permitted by API standard 620 Q.8.6, the test shall be conducted after the entire tank is complete, before the insulation is applied. Except as limited by foundation or stress conditions, the test shall consist of filling the tank with water to the design liquid level and applying an overload air pressure of 1.25 times the pressure for which the vapor space is designed. The load on the supporting foundation shall preferably not exceed the established allowable bearing value for the tank site. Where a thorough evaluation of the foundation justifies a temporary increase, the established allowable bearing may be increased for the test condition, but the increase shall be not more than 25%.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!