Vertical API standard 650 aboveground steel oil storage tanks
BBN can provide design, manufacture and installation of API 650 large oil and crude oil storage tanks. We can build a API standard 650 aboveground steel oil storage tanks 7,000,000 gallon API 650 petroleum storage tank. In addition, BBN has the means to construct multiple storage tanks at the same time. We are very experienced in providing API 650 petroleum storage tanks.
Prefabricating API standard 650 aboveground steel oil storage tanks components before construction can improve construction efficiency, save time and cost, and is currently a common method for the construction of large vertical storage tanks. The main prefabricated components of a large vertical API standard 650 aboveground steel oil storage tanks include the tank body, the storage tank wall, the top of the storage tank, the bottom of the storage tank, and the accessories of the storage tank. The prefabrication of the components should follow a reasonable workflow, and carry out appropriate heat treatment and testing, so as to improve manufacturing accuracy.
Uplift on FoundationFor API Standard 620 tanks with an internal design pressure less than 1 lbf/in.2 gauge, the uplift shall be taken as the smaller of the maximum uplift values computed under the following conditions:a)The internal design pressure times 1.5 plus the design wind load on the shell and roof.b)The internal design pressure plus 0.25 lbf/in.2 gauge plus the design wind load on the shell and roof.
Our team is a dynamic, but also mature and steady team. The talents are made of different ages. There are experienced ones, and also creative ones, that also makes our company culture diversified. We have complete department structure, to make the whole work procedure run smoothly. For every step, we have special person to be in charge and responsible for our customer and update information to the customer in time. So you just need not worry too much to purchase steel materials from our company.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).