Small API Std 650 stainless and carbon steel tank
The Charpy V-notch test shall be used, and the minimum impact value at the design metal temperature shall be as given in Table R-2. For subsize specimen acceptance criteria, see ASTM A20. An impact test temperature lower than the design metal temperature may be used by the API 620 welded storage tanks Manufacturer, but in such a case the impact values at the test temperature must comply with Table R-2.
Welding certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For both API Std 650 stainless and carbon steel tank storage tank API 650, non-destructive inspection is required, but third-party inspection is not required.
We supply 5800 tons A53 Gr B ERW pipes to Qatar for Qatar Integrated Railway Project - Green Line. This is the first Metro Line in Qatar, and it is located in Doha. We got the order by tender, launched by the Qatar Railways Company for designing, construction and completion of Green Line Project. Before putting order, a delegation from the API Std 650 stainless and carbon steel tank project side visited us and several other famous steel pipe mills in China for 15 days. Finally, we were chosen and finished the task exceeding their expectations.
}Inspection of weld and micro crack of API Std 650 stainless and carbon steel tank: the inner and outer surface of API Std 650 stainless and carbon steel tank, weld and heat affected zone shall be observed by naked eyes first. 100% ultrasonic testing or 100% penetrant testing are carried out for butt welds of API Std 650 stainless and carbon steel tank. For the defects found by 100% magnetic particle inspection, dye detection, 100% ultrasonic inspection or 100% penetrant inspection, the radiographic inspection shall be used again to ensure the accuracy of the test results.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.