Optional design procedures of API standard 650 aluminum tanks
Compared with the fixed roof API 650 oil storage tank without API standard 650 aluminum tanks floating roof, there is no evaporation space. In principle, this eliminates the so-called "large breathing loss". Evaporation not only causes the loss of product quantity, but also affects the quality of API standard 650 aluminum tanks product and pollutes the environment.
Investigation of SubgradeOn actual steel storage tank sites to be used, test borings or test pits, or both, may be made at the direction of a competent engineer who will specify the number and location. They need not be equally spaced but should be laid out to uncover possible weak spots.In general, test loadings of subgrade at the bottom of test pits need be resorted to only when such heavy loading as may be imposed by footings for major column supports for spheres or similarly elevated API 620 low-pressure tanks is specified. Results may be deceptive if average load-bearing capacity over a considerable area is wanted. All field data shall be recorded with maps, and copies shall be supplied to all engineers concerned with design, erection, and later operation.
The factors that affect the "small breathing" loss of API standard 650 aluminum tanks are: 1. Generally, the larger the storage tank is, the larger the total open area is, the larger the evaporation area is, and the greater the "small breathing" loss is; conversely, the smaller the storage tank is, the smaller the evaporation area is and the smaller the "small breathing" loss is. 2. It is related to the atmosphere. The lower the atmospheric pressure is, the greater the "small breathing" loss is; otherwise, the loss is reduced.
Training is one of the important factors in the construction of corporate culture. Online training system can be used to enable all employees to take advantage of fragmented time and carry out targeted training anytime and anywhere without the limitation of time and region. Through training to improve work skills, at the same time, through training, let all improve their quality education level, let employees work around a goal, create a career, and produce results.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
The company conducts periodic and targeted training and guidance for after-sales service personnel. As the saying goes, "no one is perfect, no gold is red", to help after-sales service personnel improve service skills and correct service attitude. Carry out relevant technical training for after-sales service personnel, so that after-sales service practitioners have professional product knowledge.