Nominal capacities of API standard 650 open-top tanks
Our company's technical department is the core department of the whole company. There are a group of very professional technical personnel. They provide some architectural drawings according to the ideas of customers, and they are responsible for how to select the right materials. Including the evaluation of steel products such as multi steel plate, API standard 650 open-top tanks and steel pipe, grasp the whole production process, and strictly follow the production standards and customer quality requirements.
API standard 650 open-top tanks construction must adhere to the design drawings, acceptance specifications and construction plans. If the design needs to be modified during API standard 650 open-top tanks construction, it must be approved by the original design unit or Party A’s representative and relevant personnel of the supervision unit, and written visa procedures must be completed in advance. The equipment and main materials used in the oil tank construction project must have certificates of conformity and quality assurance.
Design of Reinforcement for Single Openings in Tank WallsThe 20 in. x 29 in. obround manhole shown in Figure F-5 is located in solid plate in the sidewall of a cylindrical storage tank 45 ft in diameter in an area where the thickness of the wall plate, tw, is 1/2 in. No corrosion allowance is required. The total internal pressure, Pl + Pg, at the horizontal centerline of the opening is 27.5 lbf/in.2 gauge. The thickness of the wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.485 in. The manhole neck is fabricated by welding from 3/8 in. plate. The materials in the API 620 tank wall, the manhole neck, and the reinforcing pad conform to ASTM A516 Grade 60. The joints in the welded steel storage oil tank wall and the longitudinal joint or joints in the manhole neck are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.