EN S275J0 plates API standard 650 SUG I tanks

The application of API 650 is as stated by the American Petroleum Institute: The production and installation of our ground welded steel API standard 650 SUG I tanks storage tanks are generally used in industry; under normal circumstances, the storage tanks installed on the industrial site in the United States are in accordance with API 650, API 620 and API 12d Standards are established.

API standard 650 SUG I tanks Oil measuring hole: The oil measuring hole is used to measure the height, temperature and sampling of the oil stored in the tank, and is installed near the tank top platform. API standard 650 SUG I tanks Fire extinguisher: The fire extinguisher (also known as the flame arrestor) of the oil tank is composed of a fire box, a copper wire mesh and an aluminum partition. It is installed under the breathing valve or safety valve to prevent sparks and air from entering the inside of the tank through the breathing valve or safety valve and causing accidents.

In this project, an area of tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2.
The problem in this example is to find the maximum allowable (latitudinal) compressive stress value for the given conditions, in conformance with the provisions of API 620 tank standard 5.5.4.5.

We have Business Department, Transportation Department, Document Department, Shipping Department, E-C department, Procurement Department, Finance Department, Human Resources Department, Administration Department, Logistics Department, After-sales so on Departments. Each department performs its own duties, unites and cooperates, and contributes its greatest strength to the overall operation of the company. So as to ensure the stable and sustainable development of the company.

"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!