EN 10025 S355JK plates API 650 fixed roof tanks

Low-pressure storage tanks Fireproofing
Although general fire prevention and fire protection measures are expected to be fully covered by other safety codes, tanks API 650 Fixed roof tanks constructed according to these rules, which may be subject to fire exposure resulting from any cause, shall have their supports suitably fireproofed.
Special consideration shall be given to provisions for ample drainage facilities for accidental spills or leakage of flammable contents from such tanks or adjacent piping and other equipment if the contents may become ignited.
Subject to special considerations in isolated locations, tanks in which flammable liquid products are stored at temperatures well above their average boiling point shall be suitably fireproofed or otherwise protected.

Floating roof is the key component of floating roof API 650 storage tank, which can be divided into external floating roof and internal API 650 fixed roof tanks floating roof. The internal floating roof has a fixed top cover above the floating roof, which can prevent the floating roof from being exposed to wind and rain, and ensure the quality of oil stored under API 650 storage tank.

our company supplied 2300 ton API 5L GrB ERW pipe to Petroleum company in 2016. It takes 35 days for our company to finish all the production according to API 5L standard. The products are used to drilling , gas transmission works. And we supply the API5L PSL1 GR B original Mill Test Certificate, API5L PSL1 GR B pipes picture, the dimension test, the API 650 fixed roof tanks material, heat number, supplier name and size will be shown on the surface of steel pipe.

}

API 650 fixed roof tanks construction must adhere to the design drawings, acceptance specifications and construction plans. If the design needs to be modified during API 650 fixed roof tanks construction, it must be approved by the original design unit or Party A’s representative and relevant personnel of the supervision unit, and written visa procedures must be completed in advance. The equipment and main materials used in the oil tank construction project must have certificates of conformity and quality assurance.

Adhere to the spirit of quality first and user foremost, carry out maintenance and other work according to the requirements of the buyer's contract, and ensure that the engineering project and product after-sales play their application effectiveness. Our company guarantees to carry out self inspection and self supervision according to the quality management policy proposed by our company, and deliver a high-grade, perfect and excellent system engineering to users.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!