Dome roofs API standard 650 unanchored liquid-storage tanks
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
Define the welding sequence of API standard 650 unanchored liquid-storage tanks bottom plate: the welding sequence of metal vertical storage tank shall be carried out according to the procedure required by the welding scheme. Spot welding shall be consistent with the formal welding requirements, and no spot welding shall be carried out for the weld not welded. Back bar should be added to prevent deformation when welding the full length seam of middle plate, butt joint of edge plate and turtle shell joint.
Stamping of API 620 Storage Tank PlatesBefore plates required to be stamped by the steel mill are used, the inspector shall see that they bear the stamp. In laying out and cutting the API standard 650 unanchored liquid-storage tanks plates, at least one set of the original material identification markings should, if possible, be left where it will be plainly visible when the tank is completed. Should the identifying marks be obliterateSpot radiographic or ultrasonic examination shall be not less than 6 in. extending along the weld. Spot radiography shall comply with the standards given in 7.15.1.3. Where spot radiographic or ultrasonic examination is applied at joint intersections, the surface shall be prepared and examined for a distance of 3 in. on each side of the intersection, making the minimum length of examination 6 in. on the horizontal weld and 3 in. on the vertical weld.