ASTM A53 pipe API Std 650 aboveground welded storage tanks

API 650 petroleum storage tank body design is mainly the design of tank bottom, API Std 650 aboveground welded storage tanks tank top and tank wall, and the design of tank wall is particularly important. As the main pressure bearing part of API 650 petroleum storage tank, the tank wall bears loads including liquid pressure, wind pressure, seismic load, opening stress, etc. The calculation of such loads is explained in detail in various API Std 650 aboveground welded storage tanks storage tank design standards. But in addition, the API 650 petroleum storage tank wall also bears the push-pull force and torque of the connected pipeline.

Natural ventilation loss: the main cause of natural ventilation loss is that the API Std 650 aboveground welded storage tanks is not tightly sealed. This is usually due to corrosion perforation on the top of the oil tank, or there is a height difference between the two orifices. The air tightness of the mixture in the API Std 650 aboveground welded storage tanks is higher than that of the air, which causes the mixture gas in the tank to be discharged into the atmosphere from the lower hole, and the external air flows into the tank from the high hole, resulting in natural ventilation loss.

In cylindrical tank walls, the longitudinal weld joints in adjacent shell courses, including compression ring welds, shall be offset from each other a minimum distance of 12 in. The butt-weld around the periphery of a thickened insert plate, or the fillet weld around the periphery of a reinforcing plate, shall be at least the greater of 10 times the shell thickness or 12 in. from any butt-welded seam or the bottom-to-shell or roof-to-shell joint. As an alternative, the insert plate (or the API Std 650 aboveground welded storage tanks reinforcing plate in an assembly that does not require stress relief) may extend to and intersect a flat-bottom-to-shell corner joint at approximately 90 degrees.

Every customer who has visit us and witness the steel materials before delievry will be impressed by our quality control departemnt. Even not come to inspect the steel materials before delievry, our quality control departemnt will also send inspection report to the customer. For each order, no matter its quantity and value, our quality control departemnt will make strict inspection before delivery, the inspection contents include apperance, tolerance, dimension, mark, special requirements of customers, etc. To guarantee our steel materials sent to the customer is qualified.

Our company doesn't need the cheapest quotation to choose international logistics company, but the price performance ratio will be high, the service will be good, and the transportation must be safe and punctual, which will not affect the time when the API Std 650 aboveground welded storage tanks goods arrive at the destination, and the logistics situation will be well communicated with customers in advance. Therefore, when we choose international logistics companies, we will have a look at their timeliness and service attitude in advance. It is only important to transport goods according to the requirements of customers for logistics.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!