ASTM A216 grade WCB external floating roofs API standard 650 vertical welded storage tanks
Structural shapes of 9% and 5% nickel steel may be furnished to the chemical and physical requirements of ASTM A353, A553, or A645. Physical tests shall be in accordance with the requirements of ASTM A6.API standard 650 vertical welded storage tanks used Piping, Tubing, and ForgingsMaterial used for piping, tubing, and forgings shall be compatible in welding strength, and thermal expansion coefficient with the tank shell material. In addition to the specific requirements of this appendix, all piping within the limitations of 1.3.2 shall fulfill the minimum requirements of ASME B31.3.
Pipeline transportation of API 650 oil tank is not less than the maximum consumption of 3 to 5 days. The daily operating time of API standard 650 vertical welded storage tanks office buildings and fuel oil equipment is 12-16 hours; for high-end residential hotel buildings, the daily operating time is 16-24 hours.
Natural ventilation loss: the main cause of natural ventilation loss is that the API standard 650 vertical welded storage tanks is not tightly sealed. This is usually due to corrosion perforation on the top of the oil tank, or there is a height difference between the two orifices. The air tightness of the mixture in the API standard 650 vertical welded storage tanks is higher than that of the air, which causes the mixture gas in the tank to be discharged into the atmosphere from the lower hole, and the external air flows into the tank from the high hole, resulting in natural ventilation loss.