API Std 650 welded steel oil storage tanks cut-off valves
All edges of the inner wall of the API 650 petroleum storage tank to be lined or coated must be rounded and flat to a minimum radius of 3mm. The API Std 650 welded steel oil storage tanks internal welding seam must be completely sealed welding, with a smooth surface and no air holes, air pockets and local protrusions. Remove welding spatter. As specified in API 650 petroleum storage tank design drawings, the seller must perform additional surface treatment.
Soil Structure Interaction: Soil structure interaction per API 650, Section E.6.1.6 may be used for OLE design providing the damping ratio does not exceed 10 %.Allowable StressesDesign allowable stresses shall be per API 620 large welded steel storage tank, Section Q.3.3, including the 33 % increase permitted for earthquake loads.Self-anchored Inner TankThe anchorage ratio for a self-anchored inner tank, J, shall not exceed 1.0 for the OLE design combination to limit uplift and stresses in the annular plate and corner weld.Foundation StabilityThe overturning ratio defined in API 650, Section E.6.2.3, Equation (E.6.2.3-1) shall be equal to or greater than 3.0 for the defined OLE event.
The water dissolved in the oil will be separated out from the oil stored in the API Std 650 welded steel oil storage tanks for a long time, and the acidic water layer will appear at the bottom of the API Std 650 welded steel oil storage tanks for a long time, which will accelerate the corrosion of the API Std 650 welded steel oil storage tanks and cause the wall thinning and even leakage. With the increase of service life, the API Std 650 welded steel oil storage tanks must be inspected and cleaned regularly to check the hidden danger.
Company through its own API Std 650 welded steel oil storage tanks website, multimedia, radio, newspapers, the group, the handbook of the corporate culture carrier, approved and publicity column, in-depth to carry out enterprise culture construction, also through photography, painting, calligraphy, cartoon, speech, and the songs of the enterprise design, various cultural and sports activities to carry out enterprise culture construction.
As a leading international steel supplier, we have two warehouses, close to Tianjin port and Shanghai port. This superior geographical location effectively saves the domestic transportation cost and greatly improves our service level. At the same time, it also shortens our delivery time and provides more convenience for customers.
The company formulates clear service process and service standard. To do a good job in after-sales service, first of all, clear service process and service standards should be formulated to let employees know which procedures to perform and which service standards to abide by.