API Std 650 storage tanks wind girders
Impact Tests for High AlloysImpact tests are not required for the high-alloy (austenitic stainless steel) API Std 650 storage tanks base materials, nickel alloy based materials, aluminum base materials, and weld deposited for the nonferrous (aluminum) materials. Impact tests are not required for austenitic stainless steel welds deposited by all the welding processes for services of –200°F and above. Austenitic stainless steel welds deposited for service below –200°F by all welding processes shall be impact tested in accordance with Q.6.2 except that the required impact values shall be 75% of the values as given in Q.2.2.2, Item c.
The inner layer of API 650 tank is the same as that of single layer tank. It is made of high-quality steel plate in strict accordance with the standard of "steel welded atmospheric pressure vessel". The thickness of API Std 650 storage tanks steel plate reaches the standard and the service life is longer.
We exported 2150 Tons SG295 steel coils to Sudan. The Sudan customer is LPG cylinder manufacturer. Before our cooperation, he usually purchased SG295 steel coils from UAE and Turkey. And he got to know our company through our regular customers in Uganda, UAE, and his friends in China. Then he gave us the order. We invited the customer to visit us before contract, but he insisted to visit us when the API Std 650 storage tanks goods are finished production. After inspecting the size, package in workshop and witness the lab test for the SG295 steel coils, the customer was very satisfied to our quality control and professional arrangement.
}Crack treatment of API Std 650 storage tanks weld area: find out the crack tip with ray or ultrasonic flaw detection, drill cut-off holes at both ends of the crack with the cut-off method, the hole depth is slightly greater than the crack depth, or groove (crack stop groove) is made by angle grinder at both ends of the crack, shovel and grind the whole crack, and grind it into a suitable groove; use radiographic inspection and dye detection to verify that the crack has been completely excavated, and finally repair welding.
Our company has established and constantly improved the customer service system and emergency response system. Through the customer service management system, we track the service of the after-sales service team and provide efficient and standard services in time. At the same time, the company formulates a regular return visit system, compares the historical cases of customer problems, proposes a pre solution, and ensures that the service is in place in a short time.