API Std 650 open top welded storage tanks nameplates
One of the most widely used design codes is the API 650 Standard, from the American Petroleum Institute. The main objective of this standards API Std 650 open top welded storage tanks is, through the requirements contained in its various sections, to facilitate the purchase and construction of vertical, aboveground, welded fabricated tanks assuring that required safety regulations are met.
Generally, the building area temperature of the API Std 650 open top welded storage tanks should be considered before the tank design and construction. The temperature in the API Std 650 open top welded storage tanks building area is closely related to the evaporation loss, energy loss, storage tank materials and the selection of detection instruments, or has a direct impact on the storage cost of the storage liquid. For the same medium, the higher the air temperature and the longer the duration, the higher the material temperature in the API Std 650 open top welded storage tanks, the higher the corresponding pressure and the more volatile loss.
Inspection of low-pressure storage tank Butt-weldsComplete penetration and complete fusion is required (to the degree mandated by the acceptance criteria for examination method utilized) for welds joining tank wall plates to API Std 650 open top welded storage tanks tank wall plates. Examination for quality of welds shall be made using either the radiographic method specified in API 620 standard 7.15.1 and applied in 7.17, or alternatively, by agreement between the Purchaser and the Manufacturer, using the ultrasonic method specified in 7.15.3.1. In addition to the radiographic or ultrasonic examination, these welds shall also be visually examined as specified in 7.15.5. Furthermore, the Purchaser’s inspector may visually inspect all butt-welds for cracks, arc strikes, excessive undercuts, surface porosity, incomplete fusion, and other defects.
The company's sales department has a professional team, they have professional steel knowledge, respond quickly, with the problems raised by customers can quickly give solutions, put the interests of customers first. With their own professional knowledge to provide customers with high-quality steel plate in line with the requirements. At the same time, in terms of price, we also have great advantages. Members of the business department make sure that the delivery time is short and the service is the best.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).