API Std 650 mixed material tanks base metal
Impact Tests for High AlloysImpact tests are not required for oil steel storage material nickel alloy welds made with electrodes/filler metals covered by AWS Specification A5.11 or AWS Specification A5.14, provided the nominal nickel content is 50% or greater, and the weld is deposited by the shielded metal-arc welding (SMAW), gas metal-arc welding (GMAW), gas tungsten-arc welding (GTAW), or plasma-arc welding (PAW) processes. When A5.11/A5.14 specifies the nickel content as a “remainder,” the nickel content shall be determined by summing the maximum specified values of the other elements (use the average specified value for elements with specified ranges) and subtracting from 100%.The temperature requirements of the API 650 oil storage tank area are closely related to the evaporation loss, energy loss, API Std 650 mixed material tanks storage and storage platform tank materials and the selection of detection instruments, or the temperature of the API 650 oil storage tank area. The cost of storage has a direct impact.We supply 3500 tons SA387GR5CL1 steel plates to Pakistan. The main businesses of the Pakistan customer are manufacturing columns & towers, heat exchanger, waste heat recovery boiler, pressure vessel & reactors, tanks, etc. We arranged SGS test for the SA387GR5CL1 steel plates. The test contents include chemical composition analysis, tensile test, impact test, etc. The test results are satisfied. The Pakistan customer gave good feedback after receiving the SA387GR5CL1 steel plates.Treatment of API Std 650 mixed material tanks welding defects:1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.3. Slag inclusion: over standard defects shall be removed and re welded.4. Crater: weld to full after grinding.5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Latest NewsMore+