API Std 650 flat-bottom tanks automatic float-level gauge
The pressed-steel, round manhole with a 20-in. inside diameter shown in Figure F-8 is located in API 620 crude oil tank solid plate in spherical portion of a torispherical roof on a cylindrical storage tank 72 ft in diameter. The internal pressure, Pg, on the underside of the roof is 15 lbf/in.2 gauge. The thickness, t, of the roof plate required by 5.10.3 for the spherical portion of the roof is 1/2 in., which is exactly the thickness provided. No corrosion allowance is required. The materials in the oil tank roof plates and manhole frame conform to ASTM A283 Grade C steel; the main joints in the roof are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.
The API Std 650 flat-bottom tanks external floating roof tank of API 650 tank has many advantages, and its application range is more and more wide. It is a kind of storage tank with a bright future. The well-designed internal floating roof tank of API 650 tank is the best and least investment method to control evaporation loss of API Std 650 flat-bottom tanks Fixed roof tank.
our company offered 2950 ton A36 steel API Std 650 flat-bottom tanks plate to Philippines customer, which was used to build water supply project. It is the government project. The procurement with their project engineer come to China to discuss this project in middle of 2016. After checking the mill, they signed the contract with us. we supply the ASTM A36 Original Mill Test Certificate Stamped.
}API Std 650 flat-bottom tanks foam generator is a fire extinguishing device fixed on the oil tank. One end of the foam generator is connected to the foam pipeline, and one end is flanged on the top layer of the API Std 650 flat-bottom tanks wall. Fire extinguishing foam flows through the air intake entrance of the fire foam chamber, inhaling a large amount of air to form foam, and breaking through the insulating glass into the tank (glass thickness is not greater than 2mm), so as to achieve the purpose of fire fighting.
From the order to the delivery, there are three quality inspections to ensure that the qualified rate of finished products is more than 100%. We promise that every order will be tracked in a timely manner to ensure that customers can receive goods safely and constantly listen to their opinions and suggestions, reflect on our own problems, and let customers feel at ease. We have a large warehouse in Shanghai and Tianjin, which can provide customers with sufficient sources of supply.