API Std 650 cylindrical welded storage tanks external loads
Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API Std 650 cylindrical welded storage tanks test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API Std 650 cylindrical welded storage tanks test.
Facilities for API 620 Storage Tanks InspectorThe manufacturer shall afford the inspector all reasonable facilities for testing and inspection and shall provide mutually agreeable advance notification to permit the examiner to witness all tests of the equipment and materials during fabrication, including all laboratory tests of the material to be used and all hydrostatic and pneumatic tests at the site of erection.The API Std 650 cylindrical welded storage tanks inspector shall be permitted free access to all parts of the plant concerned with the manufacture of the tank during fabrication and to all parts of the plants of material suppliers who are concerned with the manufacture of materials to be used in the tank.
Oil storage tank with floating roof structure: The floating roof in the API Std 650 cylindrical welded storage tanks oil storage tank can effectively reduce the volatilization consumption of oil, because the gas space on the oil liquid surface in the floating roof storage tank is small, the exhaust volume is low, and the breathing loss is very small. That can reduce the volatilization loss caused by the "big breath" of the API Std 650 cylindrical welded storage tanks. Strengthen the inspection and maintenance of API Std 650 cylindrical welded storage tanks: regularly check the sealing conditions of oil storage tanks, and check and maintain important auxiliary equipment to ensure good sealing performance.
The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.
Steel transportation because of the special material of API Std 650 cylindrical welded storage tanks steel, is a metal with "iron" as the main basic element, small volume and large weight, and easy to oxidize and rust when contacting with air and rain water, so there are many precautions in the transportation of steel. There are 11 proverbs for steel transportation: "evenly placed, moisture-proof and rust proof". Our company chooses the logistics aspect to be very rigorous, takes the customer's request as the standard, guarantees the steel product quality.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.