API Std 650 closed top welded storage tanks vents

The tank wall design of API 650 oil storage tank. Since there is no ventilation pipe directly connected with the outside on the top of the API Std 650 closed top welded storage tanks tank, the ventilation between the inside and outside of API 650 oil storage tank is realized by the respiration valve. The constant pressure of the respiration valve is 0.3kPa, so the pressure on the top of the tank is 0.3kPa.

The preparatory work before the construction of the API Std 650 closed top welded storage tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 closed top welded storage tanks:
Before API Std 650 closed top welded storage tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

The pressed-steel, round manhole with a 20-in. inside diameter shown in Figure F-8 is located in API 620 crude oil tank solid plate in spherical portion of a torispherical roof on a cylindrical storage tank 72 ft in diameter. The internal pressure, Pg, on the underside of the roof is 15 lbf/in.2 gauge. The thickness, t, of the roof plate required by 5.10.3 for the spherical portion of the roof is 1/2 in., which is exactly the thickness provided. No corrosion allowance is required. The materials in the oil tank roof plates and manhole frame conform to ASTM A283 Grade C steel; the main joints in the roof are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.

Our quality control department will do inspection for details of the steel materials API Std 650 closed top welded storage tanks before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.

Facing the new situation and facing new goals, the company revolves around the sixteen-character development policy of “prioritizing production preservation, society-oriented, market operation, and brand creation and efficiency”. Layout the country in accordance with the modern logistics model, and accelerate the establishment of a modern integrated steel enterprise integrating steel storage, transportation, processing, and distribution.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!