API Std 650 aboveground petroleum storage tanks calculated failure pressure
This API 650 tank standard does not present orstablish a fixed series of allowable tank sizes: instead, it s intended to permit the purchaser to select whatever size API Std 650 aboveground petroleum storage tanks tank may best meet his needs.
Soil Structure Interaction: Soil structure interaction per API 650, Section E.6.1.6 may be used for OLE design providing the damping ratio does not exceed 10 %.Allowable StressesDesign allowable stresses shall be per API 620 large welded steel storage tank, Section Q.3.3, including the 33 % increase permitted for earthquake loads.Self-anchored Inner TankThe anchorage ratio for a self-anchored inner tank, J, shall not exceed 1.0 for the OLE design combination to limit uplift and stresses in the annular plate and corner weld.Foundation StabilityThe overturning ratio defined in API 650, Section E.6.2.3, Equation (E.6.2.3-1) shall be equal to or greater than 3.0 for the defined OLE event.
Prefabrication requirements of API Std 650 aboveground petroleum storage tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
The company has always been adhering to the business philosophy of "integrity-based, responsibility oriented, quality first, reputation first" and is committed to building a world-class steel materials and service provider. We will continue to work hard to carry forward the enterprise tenet of "quality is the life of the enterprise, survival by quality, development by reputation", and become an enterprise with strong vitality! We always keep it in mind that profit is important to enterprises. But what counts more is social responsibility.
Using advanced logistics management, advanced models and management experience to increase the reliability of logistics operations and provide customers with 24/7 cargo management. On the premise of reducing transportation and management costs as much as possible, we provide customers with high-quality and efficient services; good business reputation has been recognized and supported by our customers.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.