API standard 650 welded steel storage tanks thickness of shell plates
Application scope of API 650 petroleum storage tank:1. API standard 650 welded steel storage tanks Working pressure: atmospheric storage tank;2. API 650 petroleum storage tank working temperature: -30℃~150℃;3. API 650 petroleum storage tank liquid medium: various oil products, including naphtha, gasoline, diesel, kerosene, crude oil, fuel oil, heavy oil, benzene, xylene, methanol, ethanol;4. API 650 petroleum storage tank volume: current design considerations generally do not exceed 10,000 cubic meters.
Requirements for prefabrication of the top of large vertical API standard 650 welded steel storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
Design of Reinforcement for Single Openings in Tank WallsThe 20 in. x 29 in. obround manhole shown in Figure F-5 is located in solid plate in the sidewall of a cylindrical storage tank 45 ft in diameter in an area where the thickness of the wall plate, tw, is 1/2 in. No corrosion allowance is required. The total internal pressure, Pl + Pg, at the horizontal centerline of the opening is 27.5 lbf/in.2 gauge. The thickness of the wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.485 in. The manhole neck is fabricated by welding from 3/8 in. plate. The materials in the API 620 tank wall, the manhole neck, and the reinforcing pad conform to ASTM A516 Grade 60. The joints in the welded steel storage oil tank wall and the longitudinal joint or joints in the manhole neck are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
Tianjin warehouse mainly stores steel plates and steel pipes. The monthly replenishment is about 12000 tons. Our inventory cycle is short and flexible. Shanghai warehouse mainly stores API standard 650 welded steel storage tanks ,steel plate and section steel. The average monthly purchase volume is about 15000 tons. The geographical location of the warehouse has greatly improved our performance in terms of transportation and delivery time.