API standard 650 uplifting tanks roof manholes

Every customer who has visit us and witness the steel materials before delievry will be impressed by our quality control departemnt. Even not come to inspect the steel materials before delievry, our quality control departemnt will also send inspection report to the customer. For each order, no matter its quantity and value, our quality control departemnt will make strict inspection before delivery, the inspection contents include apperance, tolerance, dimension, mark, special requirements of customers, etc. To guarantee our steel materials sent to the customer is qualified.Bearing on Foundations
Foundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API standard 650 uplifting tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API standard 650 uplifting tanks test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API standard 650 uplifting tanks test.Company management philosophy: integrity-based, service-oriented, excellence, affinity symbiosis. Based on quality, continuously create maximum value for customers. Always have a grateful heart, thank the society, thank family and friends for their support and help to the development of the company, thank customers for their trust, thank colleagues for their cooperation, and thank competitors for their supervision.Some defects may be found after the regular safety inspection for the API standard 650 uplifting tanks. The common API standard 650 uplifting tanks defects are: Tank cracks, tank welding defects. The cracks on the base metal, surface and near surface of the tank wall shall be eliminated by grinding with circular arc, and then magnetic particle inspection or re inspection shall be carried out. Cracks in heat affected zone: generally, grinding method is used to eliminate cracks, and magnetic particle or dye flaw detection is used to confirm that there is no crack, and then repair welding or grinding smooth transition.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!