API standard 650 uplifting tanks bearing load
In order to ensure the safety of the vertical storage tank, API standard 650 uplifting tanks, the supplier should inspect the tank carefully before delivery. The failure of the tank body is mainly due to the weld and crack of the product. The inspection of API standard 650 uplifting tanks, vertical storage tank weld and microcrack is mainly to inspect the appearance forming quality of weld. The inspection contents include weld leg height, undercut, welding deformation, weld bead, arc pit, weld straightness, etc., as well as the internal quality of weld, such as slag inclusion, porosity, incomplete penetration, crack, incomplete fusion, etc.
Temporary Openings after Hydrostatic TestWhen approved by the Purchaser in writing, and only in the case of tanks which when complete have no shell penetrations, it is permitted to restore by welding up to four temporary shell openings after the hydrostatic test in accordance with the provisions of this section. Each temporary opening shall be restored by the insertion of a shell plate that matches the thickness and specification of adjacent shell material, and is welded into place with full fusion butt-welds. The API standard 650 uplifting tanks insert plate shall be round with diameter no less than 24 in. and no greater than 42 in.
Corrosion allowance, if specified, shall be added to calculated API 650 tanks shell and self-supporting roof thicknesses; to minimum nominal thicknesses of bottom and supported API standard 650 uplifting tanks roof plates; to nozzles and manholes; and to all exposed surfaces of internal structural members and non-removable internals.